Let GLASTECHNOLOGIES Put You in the Solar Photovoltaic Energy Business.
Photovoltaic Module Production Lines
12 MW to 25 MW or 50 to 100 MW
Yearly quantity of module Production.
And 190Wp to 2 MW semi automatic.
Description.
The system is shaped on laminator. It can simultaneously laminate 15 modules for 72 cells with a thermic cycle of 2 hours and 30 minutes. Therefore its conventional productivity is 6 modules per hour with 190 Wp modules.
The annual convetional productivy is:
6 modules X 190 Wp X 8 hours X 220 days = 2.006.400 Wp or about 2 MEGAWATTS.
The offered machines are the best you can find on sale for reability and producing capasity.
The presented striger machine can create up to 185X130 cm modules.
The offer includes
Machine supplying
One year guarantee for hardware and software starting from the delivery
Technical operative manual in English
.
12 MW
.
12 MW PV Factory manual, 12 MW PV Factory automated or Robotically controlled.


.
25 MW
.
The line has a capacity of 25 MEGAWATTS and includes:
Equipment
Robots by KUKA
Engineer and technician training in the installation, operation, and maintenance of all equipment.
Process technology, including module design,process specifications, materials specifications, and quality control procedures.
Modules can be manufactured as large as 200 x 200 cm
Demostration
Materials
Spare parts
Extended equipment warranty 24 months
Lifetime/ Phone/ Fax/ e-mail technical support
Transport and Installation
.
50 MW
.
Floor plan shows about 2400 qm.

Standard modules

240 W per module
Full automation - Lower people to do the work
The modules be designed by alu frame
Delivery: 8 months
.
100 MW
.
Factory Layout
Fully automated , robotically controlled 100 MEGAWATTS Per Year production line
Floor plan shows about 3200 qm

Training Program
Well-trained personnel are essential to the success of the PV production facility. A complete training program has been designed wich provides our customerĪs personnel with thorough understanding of the equipment and the processes involved.